水泥穩(wěn)定碎石施工各工序的注意問題!

來源:http://guixin.net.cn/ 日期:2023-01-30
下承層的檢測(cè)與修整
Detection and repair of lower bearing layer
(1)濟(jì)南水泥穩(wěn)定碎石的下承層表面應(yīng)平整、堅(jiān)實(shí),具有規(guī)定的路拱,下承層的平整度和壓實(shí)度應(yīng)符合規(guī)定。
(1) The surface of the lower bearing layer of Jinan cement stabilized macadam shall be flat and solid, with the specified road camber, and the flatness and compactness of the lower bearing layer shall meet the requirements.
(2)新完成的底基層或土基,須按規(guī)定進(jìn)行驗(yàn)收。凡驗(yàn)收不合格的路段,須采取措施,使其達(dá)到標(biāo)準(zhǔn)后,方可鋪筑水泥穩(wěn)定碎石層
(2) The newly completed subbase or soil base must be accepted as required. For sections that fail to pass the acceptance, measures must be taken to make them meet the standard before paving the cement stabilized gravel layer
(3)應(yīng)逐個(gè)斷面檢查下承層標(biāo)高。
(3) The elevation of the lower bearing layer shall be checked one by one.
(4)下層水泥穩(wěn)定碎石鋪筑7d鉆芯取樣,能取出完整芯樣(芯樣直徑為150mm)時(shí),即可進(jìn)行上層水泥穩(wěn)定碎石的施工。
(4) The construction of the upper layer of cement stabilized macadam can be carried out when the complete core sample (diameter of core sample is 150 mm) can be taken out after 7d core sampling of the lower layer of cement stabilized macadam.
混合料拌和
Mixture mixing
(1) 在正式拌制混合料之前,須先調(diào)試所用的設(shè)備
(1) Before formally mixing the mixture, the equipment used must be commissioned first
(2) 每天開始攪拌前,應(yīng)檢查集料的含水量
(2) The water content of aggregate shall be checked before mixing every day
(3) 正式生產(chǎn)后,按規(guī)定頻率檢查混合料情況,檢查配合比是否符合設(shè)計(jì)的配合比。高溫作業(yè)時(shí),早晚與中午的含水量要有區(qū)別,要按溫度變化及時(shí)調(diào)整。
(3) After formal production, the mixture condition shall be checked according to the specified frequency to check whether the mix proportion conforms to the designed mix proportion. During high-temperature operation, the water content in the morning and evening should be different from that at noon, and should be adjusted in time according to the temperature change.
(4) 拌和機(jī)出料不允許采取自由跌落式的落地成堆、裝載機(jī)裝料運(yùn)輸?shù)霓k法。須配備帶活門漏斗的料倉,由漏斗出料直接裝車運(yùn)輸。
(4) It is not allowed to adopt the method of free falling, landing and stacking, and loading and transportation by loader for the discharge of the mixer. A hopper with a valve hopper shall be equipped for direct loading and transportation from the hopper discharge.
(5) 混合料裝車時(shí)車輛應(yīng)前后移動(dòng),分三次裝料,避免離析。
(5) When the mixture is loaded, the vehicle shall move forward and backward and load in three times to avoid segregation.
濟(jì)南水泥穩(wěn)定碎石
混合料攤鋪
Mixture paving
(1)攤鋪前應(yīng)將下承層適當(dāng)灑水濕潤(rùn),然后灑水泥。水泥用量1袋/200m2。
(1) Before paving, the lower bearing layer shall be properly watered and then sprayed with cement. Cement consumption: 1 bag/200 m2.
(2) 調(diào)整好傳感器臂與導(dǎo)向控制線的關(guān)系;嚴(yán)格控制基層厚度和高程,保證路拱橫坡度滿足設(shè)計(jì)要求。
(2) Adjust the relationship between the sensor arm and the guide control line; Strictly control the thickness and elevation of the base course to ensure that the cross slope of the road arch meets the design requirements.
(3) 混合料攤鋪采用兩臺(tái)攤鋪機(jī)梯隊(duì)立模作業(yè),一前一后保證速度、振動(dòng)頻率等應(yīng)一致,攤鋪接縫平整。
(3) The mixture shall be paved by two pavers in echelon. The speed and vibration frequency shall be consistent before and after the paving, and the paving joint shall be smooth.
(4) 攤鋪機(jī)以勻速和不停歇,攤鋪速度宜在1.5~2m/min左右。
(4) The paver shall operate at a constant speed without stopping, and the paving speed shall be about 1.5~2m/min.
(5) 攤鋪機(jī)振動(dòng)頻率不得低于4.0級(jí)。
(5) The vibration frequency of the paver shall not be lower than 4.0.
(6) 螺旋分料器須勻速不間歇的旋轉(zhuǎn)送料,且全部埋入混合料中。
(6) The screw distributor shall rotate and feed materials at a constant speed and without intermission, and all of them shall be embedded in the mixture.
(7) 加設(shè)塑料擋板或廢舊傳輸帶等措施降低布料器前擋板的離地高度。
(7) Add plastic baffle or waste conveyor belt and other measures to reduce the height of the front baffle of the distributor from the ground.
(8) 攤鋪機(jī)后面應(yīng)設(shè)專人離析現(xiàn)象,應(yīng)該鏟除局部粗集料“窩”,并用新拌混合料填補(bǔ)
(8) A specially-assigned person shall be arranged behind the paver to eliminate segregation. Local coarse aggregate "pits" shall be removed and filled with fresh mixture
碾壓
Rolling
建議碾壓方式:
Recommended rolling method:
初壓:采用26T以上膠輪壓路機(jī)(或振動(dòng)壓路機(jī)靜壓),并緊跟每臺(tái)攤鋪機(jī)后面,碾壓速度應(yīng)為1.5~1.7km/h,初壓遍數(shù)為2~3遍,壓實(shí)度宜達(dá)到90%以上。
Initial compaction: rubber wheel roller (or vibratory roller static pressure) with a capacity of more than 26T shall be used and closely followed by each paver. The rolling speed shall be 1.5~1.7km/h, the number of initial compaction shall be 2~3 times, and the compactness shall reach more than 90%.
復(fù)壓:應(yīng)采用20t以上的振動(dòng)壓路機(jī),碾壓速度應(yīng)為1.8~2.2km/h,碾壓遍數(shù)不低于7遍。建議振碾組合方式:弱振1或2遍~強(qiáng)振2遍~弱振1或2遍~強(qiáng)振2遍~弱振1或遍。
Re-rolling: vibratory roller of more than 20t shall be used, the rolling speed shall be 1.8-2.2km/h, and the number of rolling times shall not be less than 7. It is suggested that the combination of vibration and rolling: weak vibration 1 or 2 times~strong vibration 2 times~weak vibration 1 or 2 times~strong vibration 2 times~weak vibration 1 or 2 times.
終壓:采用鋼輪壓路機(jī),碾壓無明顯輪跡為止。http://guixin.net.cn
Final rolling: steel wheel roller shall be used to roll until there is no obvious wheel mark. http://guixin.net.cn
  • 上一條:導(dǎo)致攤鋪機(jī)作業(yè)老是走偏的四個(gè)因素
  • 下一條:選擇購買瀝青料時(shí)如何避免踩坑?
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    A国产一区二区免费入口| 在线国产色av| 欧美经典三级视频在线| 久久这里只有精品视频9| 高清不卡AV| 日本久久国| 亚洲AV很很噜| 精品无码国产自产野外拍在线| 爱搞在线视频| 99九九国产| 青草青青国产| 在线观看国产ⅹxxx女同| 欧美成人在线视频| 色五月婷婷中文字幕网| 伊人伊人这里只有k| 日本片手机看线| 精品亚洲一区二区三区四区五区高| 久久精品国产亚洲av电影网| 亚洲自慰在线观看| 日本3a视频| 亚洲高清无码2020| 国产中文区二幕区2021| 无码成年人免费电影| 不要播放器的色网站| 亚洲国产精品麻豆| 欧美精品第五页| 国内精品日韩| 一本不卡高清无码在线| 国产另类成人精品在线| 又大又粗A级毛片免费| 日本www| 亚洲不卡无码视频| 在线i国产99| 亚洲色图图片版| 色色男免费东京热视频| av在线免费播放| 无码av最新高清无码专区| 日本免费一区二| 四虎影视avav| 69高清一区| a'v高清不卡|