成人无码在线播放,美女久久,国产精品久久一区性色AV图片,国产成人精品高清在线观看99

歡迎訪問永誠廣建公路材料(山東)有限公司網(wǎng)站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 公司新聞

公司新聞

冷補瀝清生產(chǎn)過程中要特別注意的事情

來源:http://guixin.net.cn/ 日期:2023-01-09
冷補瀝青是公路施工常常應(yīng)用到的材質(zhì),應(yīng)用次數(shù)特別高,并且應(yīng)用后的作用也特別明顯,駕駛更穩(wěn)定、地面更美觀大方、使用年限更長、修復起來也更便于,也由于這種優(yōu)勢的存有,該材質(zhì)特別受大家喜愛,那麼你對該商品的生產(chǎn)制造有哪些掌握嗎?下邊濟南瀝青生產(chǎn)廠家就為各位簡易介紹一下冷補瀝清生產(chǎn)過程中須要特別注意的事情吧。
Cold patched asphalt is a material often used in highway construction. It has been used for a very high number of times, and has a particularly obvious effect after application. It is more stable for safe driving, more beautiful and generous ground, longer service life, and easier to repair. Because of this advantage, this material is particularly popular. What do you know about the production of this product? Next, Jinan asphalt manufacturer will briefly introduce the matters needing special attention in the production process of cold patching asphalt.
1、制得石油瀝青的加溫的溫度不能高過140℃。在制得全過程中,先加上柴油機,再放進添加劑。改性材料后的瀝清溫控在100-120℃中間,攪拌均勻。
1. The heating temperature of petroleum asphalt shall not be higher than 140 ℃. In the whole process of preparation, the diesel engine is added first, and then the additives are added. The asphalt temperature of the modified material shall be controlled between 100-120 ℃ and stirred evenly.
2、攪拌時,倘若石頭是干的,冷補瀝青可以用強制性式攪拌裝置攪拌。當它不干躁時,可以用文火或無火的攪拌裝置混和,如此一來可以控制成本。干躁的溫度不能高過80℃。
2. When mixing, if the stone is dry, the cold patched asphalt can be mixed with a mandatory mixing device. When it is not dry, it can be mixed with a slow fire or a flameless stirring device, so that the cost can be controlled. The temperature of dryness shall not be higher than 80 ℃.
濟南瀝青生產(chǎn)廠家
3、生產(chǎn)制造出來的冷補瀝清用布袋子計量器包裝,有益于儲存和運輸,可以提升儲存時間,為財務(wù)核算產(chǎn)生穩(wěn)定的根據(jù)。
3. The cold make-up asphalt produced by the manufacturer is packed with cloth bag metering device, which is beneficial to storage and transportation, can improve the storage time and generate a stable basis for financial accounting.
4、堿石是有效的挑選,礦渣微粉的含水量小于2%,油石比可降低0.3-0.5%。
4. Alkali stone is an effective selection. The water content of slag powder is less than 2%, and the oil stone ratio can be reduced by 0.3-0.5%.
5、冷補瀝青進深125px以上的基坑應(yīng)逐步壓實。填平時要均勻,比地面高0.5-37.5px。搗實后,在坑的表面均勻鋪地上一層層石頭或細沙,整潔,使細沙添充坑的表面空隙。
5. The foundation pit with cold patched asphalt deeper than 125px shall be compacted gradually. The filling shall be even, 0.5-37.5px higher than the ground. After tamping, the surface of the pit shall be evenly paved with layers of stones or fine sand to eliminate tidiness and make the fine sand fill the surface space of the pit.
以上就是問題“冷補瀝清生產(chǎn)過程中要特別注意的事情”的相關(guān)解答內(nèi)容了,您對此有怎樣的問題或者需求,可以隨時來我們網(wǎng)站http://guixin.net.cn進行了解咨詢!
The above is the answer to the question "What should be paid special attention to during the production of cold fill asphalt". If you have any questions or needs, you can come to our website at any time http://guixin.net.cn Get to know!
  • 上一條:不同路面機械設(shè)備的使用方式
  • 下一條:水穩(wěn)攪拌站的修理方法
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    3PAV片| 无码岛国91| 免费看一级男毛片| 日本大香蕉一区二区| 亚洲美女香蕉视频| 精品国产一区二区三区av 性色| 3d动漫| 亚洲色图中文字幕小说| 久精品丝袜| 日韩电影a| 亚洲国产黄片视频公司| 产91在线| 孕妇AV在线| 欧美专区国产剧情| 国产精品无码在线二区| 日韩少妇情趣av| 久久精品人人做人人妻人人玩| 日韩tag毛片| 无码高潮国产69精| 精品人妻无码一区二| 国产一线二线三线www| 国产精品电影一区二区三区| 我看久久亚洲精品| 男女无遮挡免费| 亚洲日韩一中文字暮AV| 综合图区二区| 国产一级a爱做片免费| 成人宗合网| 安泽县| 武侠古典 AV天堂| 开心五月综合| 窝窝在线视频| 综合九九精品伊人| 午夜伊人狠狠久久| 五月丁香福利| 亚洲综合一区二区| 五月婷婷 中文字幕| 综合蜜桃精品| 久久精品超碰av无码| 成人免费电影久久久| 黄色大片免费国产的|